Skip to content
MaritimeTest

Ship to Ship Transfer Operations

CBT 40 questions

First 5 of 40 questions — with answers

The correct answer is marked. Unlock the rest to study the whole test, online or offline.

  1. Question 1

    Which five of the following conditions have to be considered when a location for STS transfer operation that allows for drifting or steaming during transfer is being planned?
    • The tidal current condition.
    • Sufficient sea room.
    • Safe distance to offshore installations.
    • The need to notify and obtain approval from coastal authority.
    • The availability of a safe zone free from small craft.
    • Tug-boat availability.
  2. Question 2

    According to the requirements contained in, the MARPOL Annex I - STS Plan, the national and local authorities should be notified prior to the commencement of an STS (ship to ship) transfer operation. How much notice is required for such an operation?
    • 12 hours.
    • 48 hours.
    • 72 hours.
    • 6 hours.
  3. Question 3

    In relation to STS (ship to ship) transfer operation, select the three methods by which personal would be permitted to transfer between the ships? Select all applicable answers:
    • By ship's crane suitable for this task, using a certified personnel basket and an experienced crane operator.
    • By the accommodation ladder.
    • By ship's derrick and certified personnel basket.
    • By lightweight, insulated gangway fitted with rails, safety net and securing ropes.
    • By workboat transfer.
    • By pilot ladder via the fender.
  4. Question 4

    In relation to STS (ship to ship) transfer operations which two of the given options are considered as "organisers" as defined in the module?
    • The person in overall advisory control.
    • The local agent and National Authority.
    • STS agency.
    • STS service provider.
  5. Question 5

    In relation to STS (ship to ship) transfer operations who should fill in the STS Check List no. 1?
    • The Master of each ship.
    • Ship Owners/Operators.
    • The person in overall advisory control.
    • The STS Service provider.

Preview — 5 of 40 questions

You are seeing the first 5 questions with answers. Unlock the remaining 35 to study the whole test — online or offline.

About this CBT test

Ship to Ship Transfer Operations is a CBT test with 40 questions and verified answers. Common topics include: transfer operation, sts, operations, relation, out, plan, check-list, alongside.

You can practise the free questions online — one at a time, with the correct answer — or unlock the whole test and download it to study offline, without internet.

Related CBT tests