  1. Question 1

    Approximately how long does a typical washing cycle on a fixed hold washing installation take? Select ONE correct answer.
    • 30 minutes.
    • 1 hour.
    • 2 hours.
    • 4 hours.
  2. Question 2

    Do accurate and complete written records provide supporting evidence of «due diligence» on the part of the ship under the Hague - Visby Rules?
    • Yes.
    • No.
  3. Question 3

    How can you make sure that the safe working load limits of the mucking winch are met? Select ONE correct answer.
    • By limiting the size of the lifting bucket.
    • By not over-filling the bucket or drum.
    • By only lifting low density cargoes.
    • By weighing each bucket before lifting.
  4. Question 4

    If a ship is floating in fresh water which ONE of these is the Dock Water Allowance?
    • 100 mm.
    • 25 mm.
    • Zero.
    • The fresh water allowance for the ship’s draft.
  5. Question 5

    Should a Draft Survey hydrometer be used for Load Line purposes?
    • Yes.
    • No.

Preview — 5 of 43 questions

You are seeing the first 5 questions with answers. Unlock the remaining 38 to study the whole test — online or offline.

About this CBT test

Introduction to Bulk Carriers is a CBT test with 43 questions and verified answers. Common topics include: bulk carrier, charter party, hold, water, carriers, cargoes, cargo, capacity.

You can practise the free questions online — one at a time, with the correct answer — or unlock the whole test and download it to study offline, without internet.

Related CBT tests