Skip to content
MaritimeTest

Incinerators, Team Tec Incinerator, Operation and Maintenance

CBT 9 questions

First 5 of 9 questions — with answers

The correct answer is marked. Unlock the rest to study the whole test, online or offline.

  1. Question 1

    According to this module, how often should the refractory lining be checked? Select the ONE correct answer:
    • Monthly.
    • Yearly.
    • Every 6 months.
    • When in dry-dock.
  2. Question 2

    At which chamber temperature can the sluice door be opened and feeding of garbage can start? Select the ONE correct answer:
    • 750 °C.
    • 600 °C.
    • 200 °C.
    • 1 200 °C.
  3. Question 3

    How often should the combustion chamber be cleaned?
    • Daily.
    • Once every week.
    • Monthly.
    • Twice every week.
  4. Question 4

    The maximum suction height from the tank to the D. O. burner is:
    • 12 m.
    • 9 m.
    • 6,5 m.
    • 3,5 m.
  5. Question 5

    The refractory lining of the combustion chamber can withstand a temperature of ___ °C.
    • 1 500 °C.
    • 900 °C.
    • 750 °C.
    • 170 °C.

Preview — 5 of 9 questions

You are seeing the first 5 questions with answers. Unlock the remaining 4 to study the whole test — online or offline.

About this CBT test

Incinerators, Team Tec Incinerator, Operation and Maintenance is a CBT test with 9 questions and verified answers. Common topics include: combustion chamber, temperature, refractory, suction, burner, pressure, diesel, oil.

You can practise the free questions online — one at a time, with the correct answer — or unlock the whole test and download it to study offline, without internet.

Related CBT tests