Skip to content
MaritimeTest

Deck Safety for Supply Vessels and for Anchor Handlers

CBT 88 questions

First 5 of 88 questions — with answers

The correct answer is marked. Unlock the rest to study the whole test, online or offline.

  1. Question 1

    Choose ONE option that best completes the following statement. A bulk hose laid across a supply vessel’s deck ...
    • ... is a trip risk, when crew are working near to it.
    • ... is difficult to connect up to the vessel’s deck connection.
    • ... will damage itself, as it contacts other objects on the deck.
    • ... will damage other cargo.
  2. Question 2

    Choose ONE option that best completes the following statement. Supply vessel movement ...
    • ... makes deck work more risky.
    • ... adds to the excitement of being at sea.
    • ... can easily be allowed for.
    • ... has no affect on deck working.
  3. Question 3

    Choose ONE option that best completes the following statement. The greatest risk with a supply vessel’s dry bulk system is if ...
    • ... the crew do not realise there is pressure in the system.
    • ... cement gets damp and starts to set in a tank.
    • ... cement gets damp and starts to set in the lines.
    • ... the wrong grade of cement has been loaded.
  4. Question 4

    Choose ONE option that best completes the following statement. When a cargo item is suspended above the deck...
    • ... never be underneath it.
    • ... approach it, ready to get hands to position it.
    • ... approach it, to catch the tag line.
    • ... never be on deck with it there.
  5. Question 5

    Choose ONE option that best completes the following statement. When a vessel sails out into bad weather, the anchors ...
    • ... should already be secured, or a safe heading and speed set to secure them.
    • ... can be left unsecured if the weather is expected to improve.
    • ... have to be secured, even if the deck crew have to take some risks.
    • ... will become loose and have the chains banging in the spurling pipes.

Preview — 5 of 88 questions

You are seeing the first 5 questions with answers. Unlock the remaining 83 to study the whole test — online or offline.

About this CBT test

Deck Safety for Supply Vessels and for Anchor Handlers is a CBT test with 88 questions and verified answers. Common topics include: anchor handler, greatest risk, bulk system, deck supply, possibility water, work height, simple method, crane hook.

You can practise the free questions online — one at a time, with the correct answer — or unlock the whole test and download it to study offline, without internet.

Related CBT tests